The route of the line can be seen in the image above stretching from Blaenau Ffestiniog in the top left to Bala and Bala Junction in the bottom right of the picture.
If you wish to find out more about the stock that ran on the line then please view our Stock page.
The stations in order from North to South are:
Station Name | More Information Available | Other Links | Linked Organisations | Current Status |
Blaenau Ffestiniog North | Original terminus of the Conwy Valley Line – station now closed. | |||
Blaenau Ffestiniog | Current Network Rail and Ffestiniog Railway Terminus | |||
Diphwys | Original B&FR Station | |||
Glynllifon Street | ||||
Tan-y-Manod | ||||
Graig Ddu Quarry | ||||
Tyddyngwyn | ||||
Pengwern Siding | ||||
Manod | The old station site has been built on by two private properties and cannot be rebuilt. You can see the edge of the old platform from a nearby overbridge. | |||
Teigl Halt | ||||
Festiniog | Project | |||
Maentwrog Road (Yard) | Maentwrog Road MPD (2019) | |||
Maentwrog Road | Converted to a private home and currently occupied | |||
Trawsfynydd Power Station – Loading Point | Owned by the NDA | |||
Trawsfynydd Lake Halt | ||||
Line to South Dismantled | ||||
Trawsfynydd Camp | ||||
Trawsfynydd | Converted to a private home and currently occupied | |||
Llafar Halt | ||||
Bryn-Celynog Halt | ||||
Cwm Prysor Viaduct | ||||
Cwm Prysor Halt | ||||
Arenig | ||||
Capel Celyn Halt | ||||
Tyddyn Bridge Halt | ||||
Frongoch | ||||
Bala (new) | The Bala Lake Railway intends to build a new station near the old station and once again see trains coming back into Bala again. – Appeal | |||
Bala Junction | On private land, reports state that the only remanats are the trackbeds and the platform faces. – Wikipedia |